Skip to content
Latest:
  • Minutes from March 2021 AGM Meeting
  • Minutes from February 2021 Meeting
  • Minutes from January 2021 Meeting
  • Minutes from December 2020 Meeting
  • Minutes from November 2020 Meeting
Southampton Cycling Campaign

Southampton Cycling Campaign

Your Voice for Cycling in Southampton

  • Home
  • About Us
    • Objectives
    • Monthly Meetings
    • Contact
  • News
    • Southampton News
    • London Cycling Campaign News
    • Cycling Weekly
  • Ride
    • Campaign Rides
    • Suggested Routes
    • Southampton CTC Rides
  • Suggested Routes
  • Cycling Directory
    • Cycle shops open during Covid-19 lockdown
    • Cycle Theft
    • Cycling for Beginners
    • Report a Problem
    • Cycling Blogs
    • Community Bike Groups
    • Knowledge & Resources
      • Infrastructure
      • Cycling and Intermodality
    • Southampton Bicycle Shops
  • Documents
    • Minutes of monthly meetings
    • Newsletters
    • Archives
      • Local Election Surveys
        • Election 2015
        • Election 2016
        • Election 2018
  • Join us
  • Report a Pothole
News Uncategorized 

Millbrook Road

2nd April 20084th November 2009 admin millbrook roundabout

Dale tells us,

Work will begin to resurface Millbrook Roundabout and Dock Gate 20 in April. The works are being undertaken to make the roundabout safer and so traffic can flow more smoothly in the future. This will mean there could be traffic hold ups on the roundabout for up to four months.

See earlier articles for the Millbrook Road plans.

Share this:

  • Twitter
  • Facebook
  • ← Cycling for charity
  • Southampton average road speed 17.8mph →
Copyright © 2021 Southampton Cycling Campaign. All rights reserved.
Theme: ColorMag by ThemeGrill. Powered by WordPress.